Section 101
Construction Start: Spring 2017
Construction Completion: December 2020
Cost: $62,644,459
General Contractor: J.D. Eckman Construction, Atglen, PA
Roadway Improvements
Construct two eastbound and westbound lanes, separated by a curbed grass median, on U.S. 322 (Conchester Highway) between U.S. 1 (Baltimore Pike) and Clayton Park Drive.
Intersection Improvements
(Click individual intersection for more details.)
- Upgrade traffic signals
- Add turn lanes on U.S. 322 to U.S. 1
- Upgrade traffic signals
- Reconstruct intersection to provide four through lanes and turn lanes on U.S. 322 (Conchester Highway)
- Eliminate through and left turn moves from Spring Valley Road to U.S. 322 (Conchester Highway)
- Eliminate left turn from U.S. 322 (Conchester Highway)
- Upgrade traffic signals
- Reconstruct Fellowship Drive intersection to provide four through lanes
- Add turn lanes from U.S. 322 (Conchester Highway)
- Eliminate left turns onto U.S. 322 (Conchester Highway)

- Reconstruct the intersection to provide four through lanes on U.S. 322 (Conchester Highway)
- Construct a westbound left turn lane from U.S. 322 (Conchester Highway)
- Eliminate left turns from Cambridge Drive
- Eliminate left turn moves at Merion Drive
- Upgrade traffic signals
- Add turn lanes on U.S. 322 (Conchester Highway)
- Reconstruct the intersection to provide four through lanes on U.S. 322 (Conchester Highway)
- Add a westbound left turn lane on U.S. 322 (Conchester Highway) at the Clayton Park Drive intersection
- Reconstruct the intersection to provide four through lanes on U.S. 322 (Conchester Highway)
- Eliminate left turn moves from Clayton Park Drive