322 Conchester Highway

Cambridge Drive

 

At the intersection of U.S. 322 (Conchester Highway) and Cambridge Drive, we're

  • Reconstructing the intersection to provide four through lanes on U.S. 322 (Conchester Highway);
  • Constructing a left turn lane from westbound U.S. 322 (Conchester Highway) onto Cambridge Drive;
  • Adding an deceleration lane on eastbound U.S. 322 (Conchester Highway) for right turns onto Cambridge Drive; and
  • Eliminating left turns from Cambridge Drive onto westbound U.S. 322 (Conchester Highway).

Before Construction

New left turn lane from westbound U.S. 322 (Conchester Highway)

New left turn lane from westbound U.S. 322 (Conchester Highway)

Typical new four-lane section with curbed grass median and shoulders

Typical new four lane section with curbed grass median and shoulders

Typical existing two-lane section

Typical existing two lane section

Following completion of Section 101 construction, motorists from Cambridge Drive will access westbound U.S. 322 (Conchester Highway) by heading east on U.S. 322 (Conchester Highway) and then making a legal U-turn from the left lane at the Mattson Road/Featherbed Lane intersection, or at the new Foulk Road Interchange ramps