322 Conchester Highway

Foulk Road Interchange-View 1

(Graphic updated 1/20)


Here is what is planned for the Foulk Road Interchange, which will be reconfigured and reconstructed:*

  • Reconstruct and widen U.S. 322 (Conchester Highway) to four through lanes with acceleration and deceleration lanes through the interchange;
  • Construct new off-on ramps for westbound U.S. 322 (Conchester Highway) at Foulk Road;
  • Build a new, wider Foulk Road bridge over U.S. 322 (Conchester Highway) that includes a signalized intersection with the new westbound off-on ramps;
  • Construct new off-on ramps on eastbound U.S. 322 (Conchester Highway) to and from Garnet Mine Road;
  • Reconstruct and improve Garnet Mine Road on both sides of the intersection with Foulk Road;
  • Reconstruct and improve Foulk Road through the interchange;
  • Install new traffic signals at the intersections of Foulk Road and Garnet Mine Road, and Foulk Road and the new westbound off-on ramps; and
  • Realign the intersection of Foulk Road and Green Glen Drive.

* Section 102 remains in Design. Details of improvements shown at this time are subject to change.

 


Before Construction

Foulk Road Interchange existing conditions


Foulk Road Interchange-View 2

(Graphic updated 1/20)


Before Construction

SECTION 102*

SECTION 103*

*Sections 102 and 103 remain in Design. Details of improvements shown at this time are subject to change.

Typical new four lane section with curbed grass median and shoulders

Approaching the existing Foulke Road interchange